Zhuzhou Lianxin Annual Output of 100t Cemented Carbide Products Reconstruction and Expansion Project Environmental Impact Report (Draft for Comments) Publicized


  
According to the "the People's Republic of China Environmental Impact Assessment Law" and the "Environmental Impact Assessment Public Participation Measures" (Ministry of Ecology and Environment Order No. 4), the following information is now disclosed. The second public announcement of the environmental impact assessment of the project shall be conducted to solicit opinions related to the environmental impact of the construction project.
  
  Overview of 1. Construction Project
  
Project Name: Zhuzhou Lianxin Annual Output of 100t Cemented Carbide Products Reconstruction and Expansion Project
  
Construction site: 1/F, Building 1, Standard Factory Building, Tiantai Jingu Industrial Park, Huanghe South Road, High-tech Industrial Development Zone, Tianyuan District, Zhuzhou City
  
Construction nature: reconstruction and expansion
  
Construction content: the total area is 2969.6 m2 and the total construction area is 2600 m2, and the purchased built workshop is used for construction. The main construction contents include opening up partitions and readjusting the layout, adding new production equipment and facilities such as ball mills, experimental ball mills, slurry dryers, extruders, hydraulic presses, alcohol recovery systems, etc., processing and producing hard alloy products with raw and auxiliary materials such as tungsten carbide powder, cobalt powder, carbon black, etc., and planning to build hard alloy products with an annual output of 100t bars, pipes, sheets and special-shaped parts, at the same time, supporting the improvement of water supply and drainage, power supply and distribution and other public works, as well as waste gas, wastewater treatment, noise control and solid waste temporary storage and other environmental protection projects.
  
  Internet links to the full text of the draft 2. environmental impact report and the ways and means of consulting the paper report
  
1, environmental impact report draft, public opinion form download link: https://pan.baidu.com/s/1r4RqfNMgBGpoOaVjBoURBA?pwd=r3kx提取码: r3kx
  
2. Ways and means of consulting paper reports: contact the construction unit to consult paper reports by mail, telephone, etc.
  
  Public Scope of 3. Consultation
  
Residents and enterprises and institutions around the project.
  
  Ways and means of 4. public input
  
The public can feed back the completed public opinion form to the construction unit or EIA unit within the specified time by means of letter, fax, e-mail or call, so as to reflect the opinions and suggestions related to the environmental impact of the construction project. When the public submits comments, please provide effective contact information for return visits if necessary.
  
  5. Contact Information
  
1. Construction unit: Zhuzhou Lianxin Metal Co., Ltd.
  
Contact: Director Song
  
  Contact number: 0731-22501936
  
  
Electronic E-mail: 332700420@qq.com
  
2. EIA Unit: Hunan Kunze Environmental Protection Technology Co., Ltd.
  
Contact: Tan Gong
  
Contact number: 13787030382
  
Electronic E-mail: 540551689@qq.com
  
  Start and end time of 6. public comments
  
The public can put forward valuable opinions to the construction unit and the EIA unit within 10 working days from the date of publicity of the project.